ThatLobsterCrab Posted June 27 Share Posted June 27 | | <LEVEL 3 CLEARANCE REQUIRED> | | <VALIDATING CLEARANCE...> | | <CLEARANCE VALIDATED> ____________________________________________________________________________________________ Foundation Logistics Engineering --Construction Log-- ____________________________________________________________________________________________ Name: Head Engineer Markus Morjost Date of Construction: 6/25/24 Description of Construction: MEA Scrubber Apparatus Personnel Involved: MTF Commander "Maine" ___________________________________________________________________________________________ Required Tools: Electrical Kit, Chemical Kit, Powered Bolt Screwer Required Materials: Delivered Chemicals and MEA Scrubber Unit. Potentially N/A Additional Notes: Ductwork is a bit... shotty. If anything this is what needs to be checked up on and repaired in the future. Electrical work and monitoring systems are in place and fully calibrated. A baby could understand this thing. I'm not sure if that's good, we don't want an intruder recycling CO2 into the facility's atmosphere. I will work on encrypting it; it needs similar prevention to the reactor. // RP Mod: Endbringer ___________________________________________________________________________________________ Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.